My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-03-04_REVISION - M1986015 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2002-03-04_REVISION - M1986015 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:06 PM
Creation date
11/21/2007 6:15:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
Revision
Doc Date
3/4/2002
Doc Name
Amendment Application
From
Transit Mix of Pueblo Inc
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN <br />aggregates produced there will be processed at this location. It is also possible that this <br />plant will process aggregates produced at other sites disjointed from this permit. <br />As indicated in the Mining Methods section of this exhibit, conveyors will provide <br />the primary method of supplying the plant site. This is a more efficient method of <br />transporting the aggregates from the mining location to the processing plant. Trucks tend <br />to create too much dust for more urban areas such as this, sometimes produce too much <br />noise, and are often more expensive to operate in the long run. <br />Wash fines will be disposed of in accordance with the plan described previously <br />under the section titled Dewatering. Please refer to that section for a description of that <br />plan. <br />It is important to point out that the concrete batch plant located to the north of the <br />processing plant is not a part of this mining operation. It is owned and operated by <br />Transit Mix of Pueblo, the permittee, but it is not a part of the mining operation. The <br />batch plant can and often does receive its aggregate from other sources, but this mining <br />operation can also provide aggregate to the batch plant. Although the batch plant is <br />within the permit area, it should be considered an independent facility. The main reason <br />the land where the batch plant is located is included in the permit is because of the <br />access road to the mining operation, the scale to serve the operation, and the possibility <br />that product stockpiling from the mining operation will occur near the batch plant. Those <br />uses are considered affected land and are therefore included in this permit. There is an <br />excellent possibility that the batch plant will outlive the mining operation. The batch <br />plant was located on this property many years before the current cycle of mining was <br />begun. It continued to produce concrete even though no mining was done on this site and <br />is therefore considered to be an independent facility that is not specifically subject to the <br />reclamation plan requirements. <br />Timetables of Operation <br />Although two phases are shown on the maps, only Phase 1 is planned for mining. <br />As described elsewhere, Phase 2 will be planned later and the approval of that phase will <br />be included in the permit through the appropriate action, probably an amendment. The <br />plan for Phase 2 will be based upon what is learned in mining Phase 1. <br />Phase 1 will be a continuous, highly integrated operation. There is no particular <br />value in defining "operational areas at any one time:' This is apparent from the prior <br />descriptions of how the site will be mined. In effect, the mining will begin as a rather <br />Pueblo East Pit Amendment Exhibit D Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.