Laserfiche WebLink
<br />90 01119 16 52 <br /> E 303 985 9947 SRK DE!{IiER <br />• <br />Two 3,500 gallon capacity water trucks will be used to spray the <br />tailings facility for dust control for approximately 6 months during <br />reclamation. Watering is not expected to be needed every day. <br />2 x 850/hour x 8 hours/day x 20 days/month x 6 months - 596,000 <br />Summary of Miscellaneous Costs <br />Mobilization/Demobilization - S 1,100 <br />Road Maintenance - S 57,600 <br />Water Samples - S 79,120 <br />Monitoring Well Abandonment - S 1,300 <br />Water Trucks - f 96.000 <br />TOTAL 5235,120 <br />13.5 Mill Facilities <br />Laboratory 40x75x14 - 42,000 ft3 <br />Administration 40x15x14 - 42,000 ft3 <br />Shop and Warehouse 50x135x40 - 270,000 ft3 <br /> 50x90x14 - 63,000 ft3 <br />M111 Building 48xSOx140 - 336,000 ft3 <br />(small structure on top) 15x20x45 - 13,500 ft3 <br />Desorption Room 55x19x60 - 62,700 ft3 <br /> 22x19x40 - 16,120 ft3 <br />Cyclone Cluster 20x35x32 - 22,400 ft3 <br />Refinery (located on top of 14x53x15 - 11,130 ft3 <br />leach tanks) <br />Leach Tanks 40ft tall x 40ft diameter - 402.124 ft3 <br /> 1,281,574 ft3 <br />Building removel caat~ erg ut1!lrtsd et S .13/ft3 <br />Building Demolitfon and Disposal Costs 5166,605 <br />07 <br />L-6 <br />