My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-01-19_REVISION - M1988112 (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-01-19_REVISION - M1988112 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 10:31:40 AM
Creation date
11/21/2007 6:15:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/19/1990
Doc Name
FAX COVER
From
STEFFEN ROBERTSON & KIRSTEN
To
STEVEN RENNER
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 04 <br />'90 0119 16:50 3 303 985 9947 SkK DENUER <br />• <br />13.3 Tailings 0lsoosal Area and Associated Facilities <br />Costs for reclamation of the redesigned tailings disposal o <br />are summarized below. These costs includes reclamation of the surf ac. <br />of the tailings disposal area and diversion ditches used during <br />operations and construction of the spillway. Embankment reclamation <br />costs are not included since the embankment will constructed in its <br />final configuration and be reclaimed concurrently with embankment <br />construction. Riprap to be used for spillway and channel construction <br />will be obtained from the mine site and hauled to this area during <br />the first two years of operation. <br />Tailings Site, Diversion Ditches and 5oillwav Topsoil Rgplacement <br />Topsoil placement and regrading at 51,703/acre <br />192 acres x 51,703jacre - 5326,976 <br />9 acres of disturbance <br />54,776/acre for regrading <br />54,776/acre x 9 acres - 542,984 <br />Culvert length of approximately 400 feet. <br />400 feet x 513.20/lineal foot - 35,280 <br />Excavation: D7 dozer @ S90/hr x 3 hrs/acre x 7 ac. - 51,890 <br />Concrete: 200 yd3 x S55/yd3 delivered - (11,000 <br />Labor: 1 yd3Jtruck/200 yd3 - 29 trucks <br />2 hrs/truck x Z9 trucks x 4 people x S5/hr 51,160 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.