Laserfiche WebLink
SEVT BY:mss 7-15-99 9:13AM massey~719+672 3363 :# 4i 4 <br />- ,. .. • ' • <br />~~ ~" <br />p~ <br />6 <br />~~ <br /> <br />P~"-~ <br />~°- <br />~~l <br />San Luis Mine <br />Reclamation Bond Summary <br />Page 3 <br />Mine Untt Estimated Cost Percentage <br />Completed ~ Remaining <br />Obligation Comments <br />Mill Facilities <br />(coot) i <br />' <br />radtnglTop- <br />soil Placement S 26,715 ; 26,715 <br />egetanon 4,997 0 <br />i $ 4, 23.5 acres @ <br />5212.62/acre <br />Roads <br />pmg 1,800 10 $ 1,800 <br />ng/Top- <br />soil Placement 35,353 ]0 35,353 <br />egetanon ,379 ]0 S 6,3 30 acres Q <br />$212.62/acre <br />Misaellaneou9 <br />Mobilisan <br />Demobilisation 4,00 100 ~ <br />~ S 4,000 <br />oa <br />Maintenance 72,000 ~e`-z s <br />' ~ ~ ~ <br />Water Sam es 18,400 S 18,400 <br />Monimnng <br />We11 and <br />Piezometa <br />Abandonment S 1 0 <br />•' <br /> <br />i 9 1 <br />ree Plan 17,50D 100 i , <br /> I <br />Total ,837,295 57,077 <br />Contingency <br />(25 9L) 1,209,324 I 1 ,269 <br />o Amount , ,619 I 51,0 1,346 <br /> i <br />Total ost st. <br />Amount ,889, ii <br />onungeney <br />(25'Yo) ,222,295 <br />0 0 <br />Amount 6,1 ,000 <br />1 <br />Variance between posted bond and remaining recla~ation obligation = S 5,028,654 <br />(Posted Bond) - (Remaining Reclamation Obligation) _ $6,100,000 - $ 1,071.346 <br />= $ 5,028,654 <br />