My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-12-16_REVISION - M1977344
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2002-12-16_REVISION - M1977344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2020 1:01:05 PM
Creation date
11/21/2007 6:14:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
12/16/2002
Doc Name
Second Adequacy Review-Response
From
Holcim (US) Inc.
To
DMG
Type & Sequence
TR6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />~" UffICE Ur"IIIE SIAIE EN(:INEEit <br />Ulvislrxl rd Wnll•r KiKrnnnx <br />Uelavbllcld rd Nalwnl Kcsrnuces <br />UU Slmrnuln $In!rd, Rlrom II111 <br />ihwvrv, G,Mxmir) [1117n] <br />Ihnxx! Lure nm:-~ISUI <br />rnz onn orlrl•J5m1 <br />December 4, 1997 <br />y.....,, <br />Y <br />r~.. :' <br />• ti <br />• ,1 <br />a.w n.41Mlr <br />(i1M!Ig4 <br />I.lllxM S~ L1411hrm1 <br />fw.YaAWe UNecuv <br />) Ird 1). SIIIIIgMI <br />Sl:xl• [II~IIIttY <br />Mr. Thomas B. Lewis, P.E., President <br />Resource Geosalence, Inc. <br />310 South Eighth Street, Unil B <br />Colorado Springs, CO 80905 <br />RE: Request for Variance, Standard Shallow Monitoring Hole, Typical Welt Design <br />Request No'. 97-158A <br />~' <br />Dear Mr. Lewis: <br />Thank you for your Request for Variance and approval of RGI Typical Well Design for <br />tnonllortnp wells. The Water Well Conelruotton Rules (April, 1985, Revised August 1, 1998), <br />Rule 10.4.3 provides for the construction of dewatering, monitoring and observation and <br />recovery wells to be ~nstruded with less than 20 feet of steel casing.. However, Rule 11, <br />Monitoring end Observation Holes and Test Holes; requUres that the construction of these <br />holes comply with the construction and.plugging standards sperified within the Rules, A copy <br />of the applicable rules is available from~the Division of Water Resources. <br />The Typical Well Design provided to our office has been reviewed for the Board of <br />Examiners of Water Well Consirucllon end Pump Installation Contractors. The request <br />appears to be for a variance from Rules 10.3.1, 10.4.3, 10.5.2.1 and 12.3. <br />Pursuant to Rule 18 and the authority granted by the Board, a general variance <br />to Rules 10.3.1, 10.4.3, 10.5.2.1 end 12.3 is.pranted to Resource Geosdence, inc. for <br />monitoring holes sub)ect to the following conditions:` <br />1) The monitoring hole construction will be in accordance with the Water Well <br />Construction Rules except those rules from which a variance is approved. <br />2} The well and well head construction is in acxordance with the Typical Weli <br />Design plan provided. <br />3) Please provide a copy of this variance approval with all notice of intent to <br />construct monitoring holes and permit applications submitted to this office. <br />
The URL can be used to link to this page
Your browser does not support the video tag.