Laserfiche WebLink
management have been incorporated into each facility's Mined Land Reclamation Permit. These requirements <br />include specific requirements for protection of groundwater as described in Rule 3.1.7(7)(1) through (viii) of the <br />"Construction Material Rules and Regulations" (NLRB, 2001) and the Colorado Department of Public Health <br />and Environment (CDPHE), Water Quality Control Commission (WQCC) Regulation No. 41 "Basic Standards <br />for Ground Water" (CDPHE, 2001). <br />Holcim submitted a request for a Technical Revision (TR-06) to its permit on August 16, 1999 for the disposal <br />of CKD in previously mined areas at the quarry (K-S & Company, 1999). TR-06 included a description of CKD <br />disposal procedures and facilities, a closure plan for the disposal areas, a description of erosion control measures <br />used at the site, a discussion of CKD sampling and analysis, and a description of hydrogeologic conditions at the <br />site. The DMG reviewed TR-06 and responded with an initial adequacy review letter on January 18, 2000 <br />(DMG, 2000). On behalf of Holcim, K-S & Company submitted responses to DMG's adequacy review letter in <br />May 2001 (Holnam, 2001). The DMG responded with a second adequacy review letter on October 22, 2002 <br />(DMG, 2002). This GMP will partially fulfill requirements from DMG's first and second adequacy reviews. <br />This Groundwater Monitoring Plan includes the fallowing <br />• Description of Site geology, hydrogeology and hydrology, <br />• Description of past water quality monitoring activities for groundwater and surface water, <br />• Description of planned field activities including installation of two new monitoring wells and collection <br />of groundwater elevation data and groundwater quality samples, <br />• Description of CKD leaching procedures <br />• List of pazameters, methods, and method detection limits for analysis of groundwater quality samples <br />and CKD leachate, <br />• Site plan illustrating locations of new and existing monitoring wells and piezometers, and <br />• Description of quality assurance/quality control (QA/QC) procedures. <br />BLASLAND, BOUCK & LEE, INC. <br />iznaroz engineers 8 scientists 1-2 <br />c~~~m..w hloNCOrivg ei.~ a.aoi <br />