Laserfiche WebLink
List of Tables <br />Table 1 Monitoring Well and Piezometer Construction Details <br />Table 2a Groundwater Elevation Data for MW-1 through MW-4 <br />Table 2b Groundwater Elevation Data for Monitoring Wells MW-6 through MW-10 and Piezometers P-1 <br />through P-3. <br />Table 3a Groundwater Data for Monitoring Wells MW-1 through MW-4; TCLP Metals and Total Metals. <br />Table 3b. Water Quality Data for Monitoring Wells MW-1 through MW-4, Sand Pit, and Frog Pond; TSS, <br />NH3, pH, and BOD. <br />Table 4. Groundwater Quality Data for Monitoring Wells MW-5 through MW-10 <br />Table Sa. Surface Water Quality Data for Arkansas River <br />Table Sb. Surface Water Quality Data for Bear Creek <br />Table 6a. Cement Kiln Dust Quarterly Composite Samples Routine Oxides (%) Wet Kiln Process prior to <br />2001 <br />Table 6b. Cement Kiln Dust Quarter]y Composite Samples Total Heavy Metals Wet Kiln Process prior to <br />2001 <br />Table 6c. Cement Kiln Dust Quarterly Composite Samples Composite Samples We[ Kiln Process prior to <br />2001 <br />Table 7. CKD/Sludge Leach Test Results <br />Table 8. Analytes, Methods, and Detection Limits For the Analysis of Groundwater. <br />Table 9. Analytes, Methods, and Detection Limits for the Analysis of Cement Kiln Dust. <br />BLASLAND, BOUCK 8. LEE, INC. <br />IZiIyo2 engineers & scientists iii <br />Goundwattt Monimring Plan II dot <br />