Laserfiche WebLink
Apri19, 2001 <br />State of Colorado <br />Office of the State Engineer <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Subject: Well Construction and Test Report and Well Abandonment Report, Holaam, <br />Inc., Portland, Colorado <br />State Engineer: <br />Attached is a Well Construction and Test Report for monitoring well MW-10 and a Well <br />Abandonment Report for piezometer P-1 at the Holnam, Inc. quarry at Portland, Colorado. The <br />monitoring well was installed by Precision Water Well, Inc. of Lakewood, Colorado under the <br />supervision of the undersigned who is an "authorized individual" as defined in Rule 5.2.4 of the <br />Water Well Construction Rules (2 CCR 402-2). In addition, the piezometer was abandoned by <br />the same authorized individual. <br />A variance, for the construction of wells at the site, is also included. The variance was necessary <br />due to the occurrence of shallow ground water at some locations in the quarry. <br />If you have questions or need additional information, please call. <br />Respectfully Submitted, <br />KS 8i Company, <br />Ronald J. Turner, RG. <br />Project Manager <br />ce: Wendi Abbott, Quarry Manager, Holnam, Inc. <br />attachments <br />