My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-02-02_REVISION - M1980149
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980149
>
1993-02-02_REVISION - M1980149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 6:08:05 PM
Creation date
11/21/2007 6:14:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980149
IBM Index Class Name
Revision
Doc Date
2/2/1993
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c-5. Revegetation - revegetation will occur only on <br /> the dikes above the water line of the impoundment <br /> • and on the locations disturbed by the mining oper- <br /> ation. It will consist of seeding of grasses <br /> compatible to the area as described by Soil Con- <br /> servation Service in Exhibit AA or as further <br /> recommended by that agency. Seeding schedules <br /> and application rates will be as recommended by <br /> Soil Conservation Service. Trees or shrub areas <br /> that are adaptable to the region will be <br /> included. Plantings will be in accordance with <br /> Soil Conservation Service recommendations as <br /> areas are completed for reclamation. <br /> d. See Exhibit E, paragraph C-4 , and Reclamation Plan <br /> Map, Exhibit F. <br /> e. Timetables - Phase I - 22 acres. Phase I will <br /> begin to be mined within 6 years of approval <br /> from the Mined Land Reclamation Board. This <br /> area will require approximately 4 .7 years to be <br /> mined. Reclamation of Phase I will begin <br /> approximately January, 2007 . <br /> Phase II - 30 acres. The overburden will be used <br /> to reclaim Phase I . Phase II will be mined for a <br /> • period of about 4. 5 years . <br /> Phase III - 22 acres. This area will be mined <br /> for a period of 4. 5 years and the south portion <br /> will be reclaimed for development as shown on <br /> Exhibit F. <br /> Phase IV - 53 acres . This area will be mined for <br /> a period of 10 years. The overburden will be <br /> used to reclaim Phase III as shown on Exhibit D. <br /> Reclamation of all mining phases will be <br /> completed within the five-year limit allowed by <br /> Colorado Mined Land, Act 34-32-101 , CRS 1973 as <br /> amended, revised 1988 Legislative session. Grass <br /> planting will occur according to recommendations <br /> and schedules of the Soil Conservation Service. <br /> e. ( i ) See reclamation plan and details; attached <br /> to Plan Map, Exhibit F. <br /> e. (ii) See Exhibit AA - Applicant to comply with <br /> Soil Conservation Service. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.