Laserfiche WebLink
PROJECT IOENTIFlCATION <br />Agenry or organization name : DlNSion Ot Minerals & Geob <br />gy <br />Task M: 00.? State: Cdoredo PanniVOb a:M-83-033 <br />Date: OB//52002 Counry:C/eer Creek Abbreviatbn:none <br />~- User: TAS Sile:Waistrum Quarry Fdename:M03S003 <br />Penn k or other lob action : Fmel Reclamation <br /> Task description :Load & hau/ topsoil tD hlghwel! bench Slopes <br />HC RLY O IPM NT CCST Basb machine:CA78BBG StandaN liR Horsepower : 475 <br />Attachment na. t:ROPS Cab Shin basis : lper day <br />Cowl Breakdown Ownership cosUhour: 55254 Cost data source : (CRG) <br />Operating cosMour: 563.88 f00X job utilization <br />Operator cosehour: 530.84 <br />Total and eoavhour. ff4T36 Total fleet cosuhour . $294.72 <br />MATERIAL 0UANi1ytE5 <br />Inbial Swell <br />Final <br />vONma: 22,BV CCY factor: 1.1 f5 volume: 25,441 LCY <br />Scarce of quantity take-ott :pertnd <br />Bcurce of estimatetl swell hacror:pmgram <br />(Cat HBJ <br />t ceder Cv01e Tme Unatljus[etl basic cycle time (ICaQ dump, maneuver): 0.575 minutes <br />C cle Time FaUOrs Factor (min.) Source <br />Ma[edal. M~l~rial vp fc l/d•diamarer 0.020 (Cat HB) <br />Stockpile No adjustrnent-faclornot applicable 0.000 (Cat HB) <br />Truck pwnershp. NO adjustment-/e Uprnp[applicable 0.000 (Cat H6) <br />Operatlan ~ COnsrentoperetlon -0.010 (Car HB) <br />Dump target' Nominal target 0.000 (Cat HB) <br />Net cycle time adjusbnent -0.020 minutes <br />Atliusled baelc cycle tune: 0.555 minutes <br />d Ccntlitien= <br />Haul :Rutted dirt. I)ttle maintenance, no wafer, 2'tire perietroh'on <br />Retum :Rutted clef little maintenance, nc water, 2'rire perrefrotlon <br />Haul and Retum Time Length <br />I Grade res. <br />( Rolling res. Taal ros. Tmwl time Data <br /> (fa6t) (X) (X) (X) (mInIRBS) SOURS <br /> Haul route 600 1.00 5.00 6.00 0.688 (Cat Hfi <br /> Return route 600 -1.00 5.00 4.00 0.512 (Cat H6 <br /> Total travel time: 1.210 minutes <br />i oad= i kel aoacirv Total cycle lime: 1.765 minutes <br />Rated capacity : B.20 LCY (heapetl) (Cat HB) <br />Bucket tilt facor: 0.9]5 Lo0se materiel-mixed moist aggregates (95-100%J <br />Atljuste0 capacity: L99 LCY <br />Job Contld'an CortecHen Factor=_ Source <br />Sle altitude: 7000 feet Attitude adlusimenl feIXar: 1.00 (Cat HB) <br /> Job efficiency faUOr _ <br />0.83 (f ship/day) <br /> <br /> Net eorreIXion: O.B3 multiplier <br />Unetllusted hourly unit pmtluction : 27176 LCYMr <br />Adlus[ed hoary unit production : 225.56 LCYMr (Cat HBJ <br />Adjustetl hourly fleet pratluctbn: 451.12 LCYMr <br />JOB TIME AND CO6T <br />Fleet size: 2 Loader(s) Total job time: 56.40 Hours <br />Unit cost: f0.6>3 ILCV Total jab wst: 516,621 <br />