Laserfiche WebLink
RECEIVED <br />CLIMAX MOLYBDENUM COMPANY SEP 0 62002 <br />HENDERSON MINE AND MILL <br />Division of Minerals and GeoroGY <br />Permit Revision in Response to Financial Warranty Increase <br />Technical Revision #12 to Permit M-77-342 <br />Table of Contents <br />1.0 INTRODUCTION 1 <br />2.0 NEED FOR THE TECHNCCAL REVISION 2 <br />3.0 THE TECHNICAL REVISION 3 <br />3.1 Reduction of Buffer Area Disturbance 3 <br />3.2 Structural Demolition - On Site Disposal 4 <br />3.2.1 Disposal Locations 4 <br />3.2.2 Materials Testing and Burial 5 <br />3.2.3 FW Cost Reduction - On Site Disposal 6 <br />3.2.4 FW Cost Addition - On Site Disposal 6 <br />3.2.4.1 Materials Testing for On Site Disposal 6 <br />3.2.4.2 Demolition Materials Disposal 6 <br />3.3 Structures to Remain 7 <br />3.3.1 FW Cost Reduction -Remaining Structures 7 <br />3.4 Tree and Shrub Planting 8 <br />3.4.1 FW Cost Reduction -Tree and Shrub Planting 8 <br />3.5. Mine Water Treatment and Portal Plug 8 <br />3.5.1 Mine Water Treatment 9 <br />3.5.1.1 FW Cost Reduction -Mine Water Treatment 9 <br />3.5.2 Ports! Plug 10 <br />3.5.2.1 FW Cost Reduction -Portal Ptug 10 <br />3.6 MobilizatioNDemobilization 10 <br />3.8.1 FW Cost Reduction - MobilizatioNDemobilization 11 <br />4.0 FINANCWL WARRANTY REVISION FROM TR-12 11 <br />