My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-09_REVISION - M1989120
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1989120
>
2003-12-09_REVISION - M1989120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:04 PM
Creation date
11/21/2007 6:06:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989120
IBM Index Class Name
Revision
Doc Date
12/9/2003
Doc Name
Amendment Appl.
From
DMG
To
Applegate Group Inc
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
these materials will be managed to ensure groundwater and surface water will not be impacted. Please describe the <br />nature and storage locations for all hazazdous waste that will be used on site and the measures used to contain them <br />in the event of a spill or leak (i.e. berms and liners). <br />Rule 6.4.12 Exhibit L -Reclamation Costs <br />5. The Division has reviewed the new reclamation cost estimate in the updated Exhibit L submitted with the first <br />adequacy review response. The Division will still estimate the cost to reclaim the site once all of the issues related <br />to the amendment application have been addressed. The Applicant will be notified of the outcome of the estimate <br />conducted by the Division. <br />The Division is required to make a decision concerning the Platte Valley Operation Amendment Application (AM-001) <br />by December 12, 2003. Please be advised that the Aggregate Industries - WCR, Inc. 112(c) Amendment Application <br />(AM-001) may be deemed inadequate, and the application may be denied on December 12, 2003 unless the above <br />mentioned adequacy review items are addressed to the satisfaction of the Division. If you feel more time is needed to <br />complete your reply, the Division can grant an extension to the decision date. This will be done upon receipt of a <br />written waiver of your right to a decision by December 12, 2003 and request for additional time. This must be received <br />no later than the deadline date. <br />If you have any questions, please do not hesitate to tail me at (303)866-4935 <br />Sincerely, <br />~~~~ <br />Kate Pickford <br />Environmental Protection Specialist <br />cc: Cazl Mount; DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.