Laserfiche WebLink
<br />TATS OF COLORADO <br />OFFICE OF THE STATE ENGINEER op~co~ <br />Division of Water Resources / <br />Department of Natural Resources p <br />DEC 13 2004 y~0~ <br />** <br />iii 3 Sherman street, Room ata Girision ~f Minerals and Geology <br />Denver, Colorado 90203 ~+` tgrg+~ <br />Phone (303) 866-3581 v'IFesporise t0 ReclamahOIl Permlt Apphcatlon COriSlderatlOn <br />FAX (303) 866-3589 Bill Owens <br />www.wa[ecs[ate.co.us Governor <br />DATE: December 7 2004 Russell George <br />, ~ Executive DirecYOr <br />Hal D. Simpson, P.E. <br />TO: Erica S. Crosby, Environmental Protection Specialist State Engineer <br />CC: Division 5 Office; District 53 Water Commissioner <br />FROM: Cynthia Love, Water Resource Engineer G2n~ <br />RE: Operator: Ki~~B8 Mountain Gravel, LLC, Hewe it <br />File No. M-'i~978-314, Revision No. CN-1 <br />Section 14, Twp 1 N, Rng 85 W, 6th P.M, Routt County <br />Landowner- Angus Investment, LLC <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a pemii[, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing no[ification/hearing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />® The applicant has indicated plans to use other water for: X (dust control) uses at the permit site, -storage in <br />the excavated area(s). The applicant will need to provide evidence to this office that the water is permitted or <br />decreed for such uses. <br />^ Other: <br />COMMENTS: The applicant should provide this office with the Water Court decree or pending case number for the <br />Smith Creek water rights mentioned in the application and evidence that they own this water right or have consent from <br />the owner of the right to use this water as proposed, as well as evidence that the water is decreed for such uses. The <br />applicant should also identify the quantity of water to be used on an average basis on the site and the timing of the use <br />(year-round or seasonal). The applicant may need to file for a change of water right with the Water Court to use the <br />water as proposed. <br />