Laserfiche WebLink
RECEIVED <br />DEC 12 2006 <br />EXHIBIT E RECLAMATION PLAN Division of Reclamation, <br />Mining and Safety <br />Short Term Reclamation Activities <br />Reclamation work at this site will have already commenced during the 2005 field season <br />and will continue through each field season for the life of mine. 2005 work includes the <br />environmental correction work performed during August 2005, to result in the removal of <br />mazble fines deposited in Taylor Gulch over the past number of mining seasons. A 500' <br />run of Taylor Gulch from the upper road crossing to the lower historic sediment basin <br />will be seeded with an approved seed mix at a broadcast rate of 20#/acre. In addition, the <br />roadway allowing equipment access to Taylor Gulch will also be seeded. Both azeas will <br />be mulched with clean straw at a rate of no less than 2000#/acre. Seeding and mulching <br />operations will be performed during October 2005 or May 2006, depending on weather <br />conditions. <br />Each field season following 2005, any newly placed topsoil stockpiles will receive <br />seeding and mulching to minimize loss of soil to wind and run-off erosion. Any new <br />bench areas along the western portions above the highwall will be seeded and mulched as <br />well, especially any surface run-off diversion ditches constructed along the western edge <br />of the affected land boundary. The eastern aspect of the of the lower waste rockpile will <br />be covered with topsoil with material from the lower staging area topsoil pile at a rate no <br />less than 6" prior to seeding and mulching as mentioned above. Contour furrowing <br />techniques maybe employed to stabilize slopes and minimize the formation of vertical <br />rilling (gully formation) during large storm events or sudden snowmelt. At the <br />completion of each field season, site drainage characteristics will be evaluated and <br />attended to prior to leaving the site for the winter months. Special attention will be given <br />to maintaining Taylor Gulch as a free flowing conduit for surface run-off including rain <br />events and spring snowmelt sepazate from mine site drainage, which will be routed via <br />grading and/or ditches to the lower pit area. In places where Taylor Gulch crosses Forest <br />Service Road 228, an enhanced, rip-rapped channel feature will be left at the end of field <br />season which will provide for positive drainage with a minimum disruption of the <br />original drainage pattern across the site. All roadside berms, especially those along the <br />separation zone of Taylor Gulch and mine access roads, will be inspected and reinforced <br />as necessary to maintain separation of drainages and positive flow of all in mine drainage <br />into the lower pit area. The road cut accessing the third(cunentlyhighwt) working face <br />which is located east of the affected land boundary will be closed, backfilled, and capped <br />with topsoil prior to planting with native seed mix and mulching during the 2006 field <br />season. The road cut is approximately 250' long and 16' wide and loops north and west <br />from the County Road 228 switchback towazds the marble extraction face. The road cut <br />was installed to access the upper mine workings within the past two or three field <br />seasons. The recent survey work confirmed that the road loop is not located within <br />Colorado Marble's patented claims boundaries. A signed and notarized letter describing <br />the reclamation of the road cut has been forwazd to the land owner, US Lime, Dallas, TX, <br />for their review and approval. This letter will be forwazded to DMG as soon as it is <br />available. <br />14 <br />