Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 04a <br />Date: ____12/23/2004 <br />User: SSS <br />County :Delta <br />Site :Delta Paving Gravel Pit <br />Agency or organization name :DMG <br />Permit or otherjob action :Routine Bond Recalculation <br />Task description :Replace tOp50%1 On Of <br />HOURLY EQUIPMENT COST <br /> <br />Basic machine :Cat D8R Series 11 - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment nc. 2 :3-shank ripper <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 709 LCY <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Partly consolidated stock~ila <br /> Utilization <br />$48.82 NA <br />$66.09 100 <br />$0.00 0 <br />$31.76 NA <br />$146.67 Total fleet cosUhour <br />Swell Loose <br />factor : NA volume : 709 LCY <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Top Soil <br />State :Colorado <br />PermiUjob# : M-1998-105 <br />Abbreviation :none <br />Filename : M105-04a <br />10.00 % (~ <br />4,980 feet <br />1, 600 Ibs/LCY <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.84 <br />46.67 <br />Adjusted unit production : 1181.69 LCY/hr <br />Adjusted fleet production : 1,181.69 LCY/hr <br />,. <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 0.80 Hours <br />Unit cost : $0.124 /LCY Total job cost : $88 <br />Ownership cost/hour <br />Operating cost/hour <br />Ripper op.cosUhour <br />Operator cost/hour <br />Total unit cosUhour <br />above water level <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />