Laserfiche WebLink
Geotechnical Data Technical Memorandum <br />Hazeltine -Road Runners Rest II Gravel Pit Lining Project <br />December 2000 <br />4.4.2 Phase Two Testing <br />Based on the results of the Phase One tests and estimated quantities of materials at each <br />potential source sampled during Phase One, additional laboratory tests were performed on <br />samples of the claystone bedrock from the bottom of the Hazeltine Pit and samples from the <br />overburden stockpile at the Howe-Haller Pit. Additional tests were not performed on samples <br />of the stockpiled material at the Hazeltine Pit, because available quantities were estimated to <br />represent less than 10 percent of the material required to construct the pit side slopes. <br />Additional tests were not performed on the materials from the tailings ponds because, based <br />on the data from the index tests and visual observations, it was determined that this material <br />would not have the strength, compaction, and permeability properties desired for a low <br />permeable liner or for the reservoir side slopes. <br />The three samples taken from the Howe-Haller Pit overburden stockpile were combined into <br />one composite sample. Tests performed on the composite sample included sieve analyses, <br />Atterberg Limits, Standard Proctor, back pressure hydraulic conductivity, and consolidated- <br />undrained triaxial with pore pressure measurements. <br />A consolidated-undrained triaxial shear test with pore pressure measurements and a back <br />pressure hydraulic conductivity test were performed on a sample of bedrock from the bottom <br />of the Hazeltine Pit. <br />Test results for the Phase Two Program are provided in Appendix E and summarized in Table <br />4.8. Effective and total stress failure envelopes for the remolded Howe-Haller overburden <br />stockpile samples are provided on Figures 4.1.1 and 4.1.2, respectively. Effective and total <br />stress failure envelopes for the remolded bedrock samples are provided on Figures 4.2.1 and <br />4.2.2, respectively. <br />The triaxial and permeability test specimens were prepared by moisture conditioning the <br />material to within about 1 to 2 percent above optimum moisture content and then compacting <br />the remolded material to about 95 percent of its Standard Proctor maximum dry density. For <br />the triaxial tests, the remolded specimens were consolidated at the appropriate confining <br />pressure and then tested in axial compression, which was accomplished by increasing the axial <br />load on the specimen. The specimens were generally loaded until axial strain was about 20 <br />percent. For the permeability tests, the specimens were saturated then consolidated at a <br />confining pressure of about 1580 psf. Permeability tests were performed at an average <br />effective stress of about 11 psi, which is the difference between the cell pressure and the back <br />pressure. <br />GEI Consultants, inc. 4_S <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~~ <br /> <br /> <br />u <br /> <br /> <br />98_'ISgeo tm»yC <br />