Laserfiche WebLink
RECLAMATION PLAN <br />resources, but rarely prevent the success of revegetation. Most native species that invade disturbances <br />in abundance are not considered weeds as these species are often important in the process of <br />developing new ecosystems. These native, weed-like species are rarely damaging although they may <br />be unsightly. These natives should never be controlled without good reason. <br />Topsoil - The upper portion of the soil that is usually distinguished as being darker in color than <br />deeper portions of the soil. <br />Overburden - Material between the topsoil and the sand deposit to be mined. For purposes of this <br />permit, this also includes the subsoil component of the soil. <br />Plant Growth Medium - Usually only includes topsoil, but in some instances may also include <br />overburden: <br />a. if the topsoil is limited in volume ornon-existent then overburden maybe included in <br />the plant growth medium. <br />b. where backfill is limited to only a foot or two and then capped with topsoil, the <br />overburden used in the backfill is part ofthe plant growth medium. <br />Upland -Upland refers to that land that is above the floodplain and outwash alluvial fans from <br />valleys. <br />Lowland -Lowland refers to that land from the base of the steeper slopes leading into the valleys to <br />the drainage courses. The boundary between upland and lowland maybe abrupt in some places or <br />more gradual in other places. <br />(Note: These definitions are repeated in the Mining Plan and are therefore applicable and important to <br />both the Mining and the Reclamation Plans.) <br />LIST OF REQUIREMENTS - <br />1. In general, the requirements of this reclamation plan will apply to all lands mined prior to <br />this amendment. Lands that were previously mined and reclaimed do not have to be redone <br />using this plan, but all land that has not been reclaimed as of the date of approval of the <br />amendment will be reclaimed in accordance with this plan. <br />See page 9. <br />2. Backfilling must create a final surface that does not deviate more than 25 feet from the <br />original surface elevation. The less deviation that can be created the better, but 25 feet is the <br />maximum deviation allowed. (For a description of how the amount of elevation deviation is <br />determined and monitored, refer to Exhibit E-2 - Monitoring and Compliance Methods.) <br />See page 12. <br />3. If the bottom of the mining pit is already less than 25 feet below the original surface then <br />backf"illing will include whatever overburden is available to return the final surface to an <br />elevation as close to the original grade as possible. <br />See page 12. <br />Coal Creek Sand Resource Amendment 3 (2005) - M-1988-044 Exhibit E Page 2 <br />