MINING PLAN <br />meet both reporting requirements and to maintain consistency within the required <br />elevation deviation requirements stated in the lease. A description of how this is done <br />is provided in Exhibit E-2 in this amendment. <br />4. In the event the initial estimated mining area that was prepared and mined must be <br />expanded due to additional sand being available in adjacent areas, this process will be <br />repeated for the additional area. <br />Topsail Removal and Stockpiling: <br />REQUIREMENT: Topsoil removal will occur to the depth indicated in the <br />pre-mining assessment described above. In the event pockets of soil are encountered that are thinner <br />or thicker than the indicated depth, adjustments in the salvage depth will be made. Topsoil stockpiling <br />will occur at appropriate locations on land adjacent to the anticipated mining area. <br />REQUIREMENT: Topsoil stockpiling will occur on land adjacent to the <br />anticipated mining area. These stockpiles will be located where erosion off of the piles will not result <br />in excessive sedimentation into adjacent drainageways. The stockpiles should be located where a need <br />to relocate the stockpile is minimized and where replacement of the soil on backfilled land is <br />comparatively easy. All overburden stockpiles will be placed such that erosion of the stockpile does <br />not discharge sediment into nearby drainages. <br />Discussion: Topsoil stockpile placement may not always be able to meet these <br />requirements strictly simply because the lay of the land or indefinite sand deposit characteristics <br />prevent this from occurring. However, preventing excessive sediment discharge into drainageways <br />will always be observed, even if that means locating a stockpile further from the mining area than <br />would ideally be desirable. Rounded mound stockpiles tend to be the easiest to manage and look <br />better, although they can be difficult to produce. <br />REQUIREMENT: Topsoil stockpiles will be sloped and prepared for protective <br />seeding. The side slopes will not be steeper than 2:1. <br />Exception - If the stockpiled soil is expected to be replaced prior to such additional <br />steps to protect the stockpile would be effective, protective measures are not necessary. However, in <br />Coal Creek Sand Resource Amendment 3 (2005) - M-1988-044 Exhibit D Page 31 <br />