My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-12_REVISION - M1995057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995057
>
2005-01-12_REVISION - M1995057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:02 PM
Creation date
11/21/2007 5:56:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995057
IBM Index Class Name
Revision
Doc Date
1/12/2005
Doc Name
Incomplete 110 Amend Appl
From
DMG
To
Ms. Deb Rudibaugh
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit E -Map. <br />(n~ identify the primary and secondary commodities to be mined extracted and describe the intended use; <br />and <br />(o) name and describe the intended use of all expected incidental products to be mined/estracted by the <br />proposed operation. <br />EXFIRi'r n - Reclamation plan (Bolt Fs.a~: (1) The purpose of the Reclamation Plan is [o describe the timing, <br />procedures, criteria and materials that will be used to reclaim the affected land to the proposed future land use. This <br />plan must be correlated to Exhibit E -Map. The description of the Reclamation Plan must be adequate to satisfy [he <br />requirements of Section 3.1 and demonstrate compliance with Rule 3. At a minimum, the Application shall include the <br />following information: <br />(a) specify at what point in the mitring plan and to what depth(s) overburden will be replaced in relation <br />to ongoing extraction. <br />(b) specify the maximum gradient of reclaimed slopes (horizontal:vertical). If the Application proposes <br />slopes steeper than 3: 1, you must include a justi5cation that supports steeper slopes for the proposed post-mining land <br />use, and demonstrates compliance with the applicable performance standards of Section 3.1. <br />(c) specify the measures that will be taken to revegetate the site, if applicable, including: <br />(i) The thickness of plant growth medium to be replaced. Sample and analyze available soils <br />sufficiently to establish quantity and quality; <br />(ii) state at what point in the mining plan the site will be seeded. Explain how the seedbed will <br />be prepazed to eliminate compacted conditions (e.g., plowed, chiselled, disced). State [he type, application rate, and soil <br />incorporation methods of fertilizer application, if any. NOTE: Soil amendments shall only be applied where soil tests <br />indicate nutrient deficiencies for the plant species to be established; <br />(iii) state the grass, fort, shrub and tree species to be planted and [he applicable quantities. <br />Specify the quantity of each grass and fort species as pounds of pure live seed per acre; <br />(iv) specify the application method for grass and fort seeding. If the seed is to be broadcast, the <br />appiication rate shall be twice the rate required for seed drilling. L` the seedbed has not been adequately roughened prior <br />to seeding, the seed shall be raked or harrowed after broadcast application; <br />(v) if a mulch is needed, specify the kind to be used, the crimping method, and rate of <br />application; and <br />(vi) explain the establishment methods for each species of shrub and/or tree, and state the number <br />of each to be established per acre. <br />(d) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. These <br />features must be shown on the Exhibit E -Map. L` ponds are part of the Reclamation Plan, slopes from 5 vertical feet <br />above to 10 vertical feet below the expected average water level cannot be steeper than 3H:1 V; remaining slope lengths <br />may not be steeper than 2H:1 V. Where wildlife habitat is the proposed future land use, shorelines should be irregularly <br />shaped to promote a diverse wildlife habitat. The Colorado Division of Wildlife (DOW) must be consulted where <br />wildlife use is the proposed futwe land use. <br />(e) Specify the reclamation treatment of any waste rock dumps, tailing impoundments, underground mine <br />openings, ditches, sediment control facilities, buildings and other features specified in your mine plan but not previously <br />
The URL can be used to link to this page
Your browser does not support the video tag.