Laserfiche WebLink
< ir~~ ' ~ <br /> <br /> I <br /> ~a <br />r/ <br /> <br />i <br />0 <br />15 ft. or 5 yd. per side due to sloping = 200 yd per side x 4 sides = 800 yd <br />x 6.25 yd = 5,000 yd <br />of fill material <br />Cut banks from IH-1V to 2H-1V <br />Total Material 5,000 yd <br />Area distance - 58 ft <br />RECLAMATION COSTS <br />Cost to Push Topsoil 175 ft. _ $ 5,513.22 <br />7,260 yd x .675 yd <br />Cost to Push Overburden 58 ft. _ $ 1,165.00 <br />5,000 yd x .233 yd <br />Seed 10 acres @ $500.00/acre = $ 5,000.00 <br />Mobilization 200/hr for 1 Dozer <br />And Seeding Eq. = 800.00 <br />SUBTOTAL = $ 12.478.22 <br />+ 15.8% Overhead = 1 971.56 <br />TOTAL = $ 14,450.00 <br />Cost Per Acre on 10 Acre Site <br /> <br />