Laserfiche WebLink
GEOSYSTEM SLOPE STABILITY PROGRAM <br />SB-SLOPE <br />PROJECT DATA: <br />Project: FORT LUPTON PIT <br />Location: <br />Filename: P1-C2 Description: <br />FLNALYSIS DATA: <br />Point Coordinates <br />No. X Y <br />1 0.0 36.0 <br />2 82.0 36.0 <br />3 0.0 32.0 <br />4 84.0 32.0 <br />5 0.0 25.9 <br />6 23.0 25.0 <br />7 48.0 23.5 <br />8 68.0 21.5 <br />9 78.0 19.8 <br />IO 88.0 16.2 <br />11 93.0 10.9 <br />12 96.0 8.0 <br />13 0.0 4.0 <br />14 98.0 4.0 <br />15 0.0 0.0 <br />1~ 100.0 0.0 <br />Line Left Right Soil Phreatic <br />No. Point Point No. Line <br />1 1 2 1 N <br />2 3 4 2 N <br />3 5 6 3 Y <br />4 6 7 3 Y <br />5 7 8 3 Y <br />6 8 9 3 Y <br />7 9 10 3 Y <br />8 10 11 3 Y <br />9 11 12 3 Y <br />10 13 14 4 N <br />11 15 16 5 N <br />12 14 16 4 N <br />13 12 14 3 N <br />14 4 12 2 N <br />15 2 4 1 N <br />Soil Density Cohesion Phi <br />No. pcf psf Deg <br />1 90.0 4 34.0 <br />2 130.0 0 35.0 <br />3 137.0 0 35.0 <br />4 142.0 0 14.0 <br />5 150.0 500 25.0 <br />