My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-03-27_REVISION - M1977151
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977151
>
2003-03-27_REVISION - M1977151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:57 PM
Creation date
11/21/2007 5:50:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977151
IBM Index Class Name
Revision
Doc Date
3/27/2003
Doc Name
Technical Revision
From
R M Hiner Construction Co Inc
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ,. _ <br />PIPELINE CONTRACTORS <br />.MAINLINE AND DISTRIBUTION <br />11 AUSTIN ROAD REX M. HINER <br />LAMAR, COLORADO 81052- SHARON A. HINER <br />719 336-3+167 <br />State of Colorado <br />Division of Minerals b Geology <br />Department of Natural Resources <br />1313 Sherman SCreet Room 215 <br />Detrver Colorado 80203 <br />ATTN &ate Pickfozd <br />Savironmental Protection Specialist <br />Geologist <br />Ma Pickford: <br />January 15, 2003 <br />DECEIVED <br />MAR 212003 <br />Division of Minerals and Geology <br />RE: Greeley Pit <br />M-1977-151 <br />Per our recent telephone conversation, I contacted Ron Richardson in Greeley <br />to have him fax me a copy of the correspondence between him and Greg Stasinos, <br />EMP regarding the fluid spill at the Greeley Pit. <br />The fax is a little hard to read, so I called Ron and had him read it to me so <br />I can pass it on to you: <br />Contaminated soils (est 2000 CY) excavated and stockpiled behind containment <br />berm on-site. Materials will be distributed and windrowed on-site in Spring <br />of 2003 before being processed through sand and gravel operation. Excavation <br />filled with clean, on-site materials to original grade. <br />Initial report received from Emergency Management Program on 12/02/02 with <br />several follow-up telephone conversations with Gene and Ron Richardson (RCI) <br />regarding clean-up efforts. Product apparently released from an aboveground <br />storage tank as a result of vandalism. Although original report indicated <br />fish had been killed, nobody apparently witnessed dead fish at site. Product <br />was an off-road diesel product which is colored with a red dye. No apparent <br />product an water or embackments based upon 12/17/02 site visit. <br />I believe the rest of the report you can read - I have attached the copy I <br />received for your review/file. <br />Should you have any other questions, please call me at the Lamar office and <br />I will be happy to assist - 719/336-3467. <br />Thaalc You. <br />Re$pectfully, <br />- Sharon A Hiner, cofowner <br />Secretary/Treasurer <br />R M HINER CONSTRUCTION CO INC <br />attachment ~ o p~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.