My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-23_REVISION - M1987092
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987092
>
2003-12-23_REVISION - M1987092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:52:01 PM
Creation date
11/21/2007 5:48:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987092
IBM Index Class Name
Revision
Doc Date
12/23/2003
Doc Name
Cost Estimate
From
B & G Stone
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~r s <br />'ROJECT IDENTIFICATION <br />~ <br />Task # : 0 <br />State :Colorado PermiUjob# : M-1987-092 AM. 01 <br />Date : 12/23/ County :Larimer ~ Abbreviation :none <br />User : GRS Site :B & G Stone Filename :M 01-001 <br />Agency or organization name : CO. DMG <br />Permit or other job action <br />Task description :qM-01 <br />,: ; <br />>:. : <.: <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8U Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.82 NA <br />Operating cosUhour : $64.21 100 <br />Ripper op.cost/hour: $0.98 f0 <br />Operetor cost/hour : $30.65 NA <br />Total unit cost/hour : $147.67 Total fleet cosUhour : $147.67 <br /> <br />> <br />MATERIAL QUANTITIES ,: ;: <br />.,. <br />Initial Swell Loose <br />volume: 4,500 LCY factor: NA volume: 4,500 LCY <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor : NA <br />>: <br />,:. ,:: <br />HOURLY PRODUCTION Job Condition Correction Factors <br /> <br />Source <br />Average push distance : 250 feet <br />Unadjusted hourly production : 400.0 LCY/hr <br />Material consistency description <br />PaRly consolidated stockpile <br />Average push gradient : 15.00 <br />Average site altitude : 6,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $1.121 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.67 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.33 <br />HB) <br />Adjusted unit production : 131.71 LCY/hr <br />Adjusted fleet production : 131,71 LCY/hr <br />Total job time : 34.17 Hours <br />Total job cost : $5,045 <br />
The URL can be used to link to this page
Your browser does not support the video tag.