My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-09-19_REVISION - M1997058
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997058
>
1997-09-19_REVISION - M1997058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:31:06 AM
Creation date
11/21/2007 5:47:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997058
IBM Index Class Name
Revision
Doc Date
9/19/1997
Doc Name
BASELINE RESOURCE - AMENDMENT APPLICATION FOR DMG REGULAR OPERATIONS 112 PERMIT
Type & Sequence
SR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mining in Phase 3 will commence with the completion of Phase 2 (with the exception of Phase <br /> 2D). Mining will occur at south side of the mining area and proceed to the northwest and all <br /> aggregate materials will be taken to the processing area by haul trucks. Last, the processing area <br /> will be mined (Phase 2D) and once this Phase has been completed, all equipment will be moved <br /> off site. <br /> Each year approximately two to five acres of land will be mined. Annual production will depend <br /> upon the demand for construction materials on the northern metro area of Denver. The <br /> anticipated production is from 200,000 to 450.000 tons per year. This production will also vary <br /> dc-pending on the amount of outside sales as related to internal production of concrete and <br /> asphalt. <br /> Generally we believe the mine will progress according to the following time table: <br /> Phase I 1 year <br /> Phase 2A 4 years <br /> Phase 2B 3 years <br /> Phase 2C 4 years <br /> Phase 3 6 years <br /> Phase 2D 4 years <br /> Final Reclamation 3 years <br /> Total Operation 2.)years <br /> During the first 22 years, the processing plant will operate. The processing area contains the <br /> crushing and screening equipment for the raw material. Some of the material will be washed for <br /> use in the on-site concrete plant. An on-site asphalt plant will also use some material. Recycling <br /> is becoming an accepted method of operation in the industry. Therefore, we will have a plant <br /> here to reprocess concrete and asphalt. Some special aggregate products may be imported to the <br /> site for sale and use in the concrete and asphalt. <br /> The following equipment and facilities will be utilized in this operation: <br /> Loaders (3) Bottled Water Scraper (1) Aggregate Wash Plant (1) <br /> Feeders (3) Fuel Truck (1) Fuel Tank (1) Electric Control Van (1) <br /> Screens (2) Mechanic Truck (1) Stacking Conveyor(3)Asphalt Batch Plant (1) <br /> Generators (2) Portable Toilets (3) Dozer (1) Concrete Batch Plant (1) <br /> Crushers (2) Scale (I) Road Grader (1) Ready Mix Concrete Trucks <br /> Conveyors (4) Haul Trucks (4) Shop Building (1) Office Trailer (1) <br /> Excavator (1) <br /> D-2 <br />