Laserfiche WebLink
R~cEivEO -STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER DEC t if 200q <br />Division of Water Resources <br />Department of Nawral Resources <br />7313 Sherman Street, Room 878 Division ~f Minerals and Geology <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 Response to Reclamation Permit Application Consideration <br />FAX (303) 866-3589 <br />www.watecstate.co.us <br />DATE: December 14, 2004 <br />TO: Thomas A Schreiner, Environmental Protection Specialist <br />op'coco <br />~w <br />«e <br />+ >r <br />M N <br />f1876x <br />Bill Owens <br />Governor <br />Russell George <br />&ecutive Director <br />Haf D. Simpson, P.E. <br />State Engineer <br />CC: Division 6 Office; District 47 Water Commissioner <br />FROM: Cynthia J. Love, Water Resource Engineer <br />RE: Operator: Jackson County Road & Bridge, B M East Griavel Pit <br />File No. M-1977-472, Revision No. CN-1 <br />Section 20, Twp 9 N, Rng 78 W, 6th P.M., Jackson County <br />Landowner - U.S. Bureau of Land Mana¢ement <br />CONDITIONS $OR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclatnation, ^water <br />removed in the mined product, ^pmcessing, ^other. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a grovel pit or other type <br />of well pemrit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the pernut azea. The applicant antst then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit azea or contact this office regazding the <br />600 foot spacing riotification/hearing process. <br />^ The proposed operation may have potential impact on existing water rights neaz the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />^ The applicant bas indicated plans to use other water for:_uses at the permit site, -storage in the excavated <br />azea(s). The applicant will need to provide evidence to this office that the water is permitted or decreed for such <br />uses. <br />® Other: The application materials do not indicate that any water will be used at the site. Therefore, no water use <br />may occur during or aRer mining operations. <br />