Laserfiche WebLink
FAR-28-2005 1055 I~AFRRC£ 3036574212 P.06i07 <br />i-. ~-.. <br />,' Page 6 tnlorsdq pepstSment..~ Public Heatdj end EnWronmettt . <br />Air Pollution Ciontrol:OWlslon <br />Lafarge West; he <br />Parrrtit No. 981pE0489F . <br />Final Approval <br />PARTICULATE EMISSIONS CONTROL P1JUV FOR MiNRt3 AND PROCESSING ACTItliIIES <br />THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED FOR COMPLIANCE <br />PURPOSES ON THE ACTIVI'f1E5 COVERED BY THiS PERMIT, AS REQUIRED 6Y THE AIR QUALITY <br />CONTROL COMMISSION REGULATION N0.1, SECTION 111,0.1.b. THIS SOURCE IS SUBJECT TO THE <br />FOLLOWING EMISSION GUiDELINESc <br />a. Mining and Proeaaabtg Aetivitiss -Visible emissions not to axcaed 20%, nooff-property transport of <br />visible emissions. <br />b. Haul Roads • No off-property transport of visible emissions shall apply to on-site haul roads, the <br />nuisanao guidelines shall apply to off-site haul roads. <br />c. Haul Trucks -There shall he no aff•propetty transport of visible emissions from haul trucks when <br />operating on the property of the owner or operator. There shall be no oit-vahlclc transport of vls'ible <br />emissions from the materiel in the haul trucks when operating off of the property of the owner ar <br />operator. <br />Control Meastxea <br />1. Adequate soil moisture must be mointained in topsoil and overburden to control emissions as needed <br />to comply with CandiUcn No. 3 during removal. Watering shell be implemented N necessary. <br />2. Topsail and overburden stoekp7es shall be compacted and ravegetated within one year. <br />3. Emissions from material handling (i.e, removal, loading, and hauling) shall be controlled by watering <br />at all times unless natural moisture is sufficient to comrol emissions. <br />4. Vehicle speed an unpaved roads and disturbed erase shall not exceed a maximum of 10 m.p.h. <br />Speed limit signs shall he posted. . <br />5. Vehicle speed on haul roads and service reads shall be restricted to 10 miles par hour. Speed limit <br />signs shall be posted. <br />6. Chemical stabilizers shall be used for unpaved haul roads as needed to control fugitive particulate <br />emissions such that tho above guidelines are mat. <br />7. Reclamation works and sequential extraction of material shall be initiated to keep the total disturbed <br />areas at any one time to a minimum. <br />8. Plant entryway, truck service roads, and concrete botching areas shall De graveled. Watering shall <br />tx implemented if emission guidelines above are not met. <br />123105391001 <br />