Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERAIS AND GFOLOGY L/~ <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80103 <br />Phone: (303) 866-3567 <br />FAX: (3031 832$106 <br />March 7, 2006 `~/ / <br />Mr. Tyler Packard `~ <br />Corals Bayshore, LLC <br />9110E Nichols Ave Ste 180 <br />COLORADO <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />0.ECLANAilO N•NINING <br />SAFETY•SCIENCE <br />Bill Owens <br />Governor <br />Russell George <br />ExeMive Director <br />Ronald W. Canany <br />~P / Division Diector <br />Englewood, CO 80112 ~ 1 a~ p,'7 - / Natural Resource Trustee <br />Re: Siegrist Const Co, Permit No. M-1982-015, Receipt of 112 Construction Materials Reclamation Permit Amendment <br />Application Paekage, AM -1 <br />Dear Mr. Packazd: <br />On Mazch 7, 2006, the Division of Minerals and Geology received yow 112 Construction Materials Reclamation Perrrrit Amendment <br />Application package for the Siegrist Const Co, Permit No. M-1982-015. Preliminary review of the information received determined <br />that the Following items must be received before the Division can consider yow applicator as being submitted and technical review <br />can begin: <br />APPi.irATTON Ft3RM: page 1, #2: The Division requires that the operation name match the operation name on the <br />original pemrit. The site Warne listed on the original pemlit and in ow records is Siegrist Constmction Company; <br />Page 1. #3: Total Acreage not listed; <br />Sigoatwe Page: The Division requires a corporate seal be affixed to the signature page. <br />Yow application will not be considered submitted until the information listed above is received and found sufficient to begin ow <br />review. A decision date will be established 90 days from the date of receipt of all of the requested information. Additionally, if you <br />have already published notice you will need to republish notice, after the Division considers the application submitted, This notice <br />must be published once a week far fow (4) consecutive weeks, starting within ten (10) days of the date your application is considered <br />submitted. We will notify you when you should initiate republication of yow notice. The final date for receiving comments is the 20th <br />day after the fourth publication or the next regular business day. <br />You have sixty (60) days from the above date to submit all necessary documents that the Office needs for an application to be <br />considered filed. If, at the end of the sixty day period, the application has not been determined to be filed with the Office, the Office <br />shall deny the application and terminate the application file. <br />This letter shall not be consRued to mean that there aze no other technical deficiencies in yow application. The Division will review <br />yow apphcaton to determine whether it is adequate to meet the requirements of the Act after submittal of all required items. <br />Sincerely, <br />~C~-~ ~1~C~' <br />Elizabeth Shelton <br />Program Assistant <br />Encloswes <br />cc: Mike Siegrist, Siegrist Construction Company <br />Office of Once of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />