My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-01-22_REVISION - M1988112 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-01-22_REVISION - M1988112 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 10:42:00 AM
Creation date
11/21/2007 5:40:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/22/1990
Doc Name
SAN LUSI PROJECT PERMIT AMENDMENT FN M-88-112
From
STEFFEN ROBERTSON & KIRSTEN
To
MLRD
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grading of spillway area of 7 acres. <br />7 acres x 54,776/acre = 533,432 <br />Spillway Construction Costs S 47,482 <br />Riorao Placement for Soillwav and Enerov Dissioator <br />Approximately 1 acre of riprap placement in spillway and 6 acres of <br />riprap placement in the collection pond/energy dissipator area. <br />A loader will be used for placement. <br />Riprap will be stockpiled within 500 feet of the placement areas. <br />A round trip of the loader is conservatively estimated apt 4 minutes. <br />11,300 yds3 x 1 trip/3ydss = a.~a~ c~,v5 <br />545/hour x 3,767 trips x 4 minutes/trip x 1 hr/60 min = 511,301 <br />Low Flow Channel Construction Costs <br />Total channel length of 7,400 feet. <br />Low flow channels to be constructed using grader. <br />Because of the need to ensure proper construction of the low flow <br />channels, the grader will be working slowly, conservatively a <br />construction rate of 1,000 feet of construction per hour. <br />In addition, two workers will be assigned to follow the grader and <br />add finishing touches to the channel as well as hand place the <br />required riprap. <br />S70/hour x 8 hours ~ f560 <br />2 workers x 55.00/hour x 1 hour/200 feet x 7,400 feet - 5370 <br />Low Flow Channel Construction Costs ~ 5930 <br />TOTAL TAILINGS RECLAMATION COSTS 5434,953 <br />L-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.