Laserfiche WebLink
<br />• <br />.TATTLE MOUNTAIN GOLD COMPANY <br />.. <br />September 24, 1992 <br />Mr. Larry Oehler <br />Mined Land Reclamation Division GEOID CSMPANY <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Subject: battle Mountain Resources - San Luis <br />MI,RD Permit No. M-88-112 <br />Tailings Sampling <br />Dear Mr. Oehler: <br />The attached memorandum from Kent Peter of Steffen R•~bertson <br />and Kirsten, Inc. describes preliminary inplace tailings <br />sampling program for the upper and lower impoundments. The <br />sampling and testing program is in preparation for t'ne <br />scheduling of the Phase 2 impoundment lift. I wish to <br />emphasis that this is only preliminary work to gain <br />information about current inplace tailings densities. <br />Additionai, sampling and testing will need to take place <br />closer to the construction of the lift. <br />iMpll~.~'r~xl tales -on Thoras~ay, ~~ 1 • . <br />If you have any questions, please contact me• <br />Sincerely, <br />Alana L. Scott <br />Environmental Engineer <br />Enclosures <br />PO. ROX ?i0 SAN LUIS, COLORADO SITS?-031U (719) 67:-3?62 FAX (719) 672-7363 <br />?G'd 600'~N S~:<_T c6.SZ d3S S9~~S-Z~J-6i':QI ~y Q~00 'Pllbd 3~11Hd <br />