Laserfiche WebLink
~ . I ~ <br />/ • • <br />Charles L. Jackson - 2 - May 4, 1x88 <br />Topsoil Stockpile, Road and Canal Location <br />Your proposal to change the method of topsoil stockpiling and the <br />location of this and the referenced facilities appears to be in <br />compliance with the applicable rules. Therefore, it is approved in <br />accordance with Rule 1,9 <br />This approval does not extend to the amount of topsoil necessary to be <br />salvaged. The requirement to salvage enough material to replace <br />6-18 inches, or a 12-inch average, depth of soils remains a condition of <br />your permit until we've resolved the item noted above, "Topsoil <br />Replacement Requirements." <br />Approval of alternate bonding, topsoil salvage and facility location <br />requirements should substantially reduce costs at the Henderson Mine. <br />I appreciate your consideration of our concerns with regard to topsoil <br />replacement requirements and look forward to working with you on this issue. <br />If you have any questions, please contact me. <br />Sincerely, <br />~~ <br />Edward L. Bischoff <br />, ~ <br />Minerals v <br />Program rvisor <br />ELB/hm <br />cc: Diana Bi11s <br />7141 F <br />