Laserfiche WebLink
AreadA barn Access Rnatl hex :w~xg h I~orr' Ertl sx~RCnhack nn western 'eg Light tar. stop ou••Cv,g the <br />rdls~oe h suaessldi revegeta6on wog 6N~ saearng rm m~ic slaaa u' aUandonad segment o' the aarfler roar <br />Tna road segment x~e• abaracned in 14d3 Ceta~•se ds s~s!amva yrada via<_ ;co seep tc• ~,cvo!o trucks in <br />vavarse Adartee ve ,ela7.:e wear nas ce,blopen <br />The 7 acre surface of the active Dam. Access Road is currently In its final pcst- <br />m+ning land use icrm, and alt 38 acres of roadside cut and fell slopes associated w+th this <br />road have been reclaimed .r. accordance wdh the approved reclamation plan, as <br />amended ~n the 1982 Intenm Sde Plan Ali a5 acres of sub-area t3A are requested for <br />release from the affected area- The 6 acres al [he Summit Office slte are not being <br />requested for release at this time. <br />a.3.2.a Davls Gu:ch Road fISP Area 10) <br />ISP Area 10 includes 35 acres in As four subareas Only one of these areas s <br />p;opasec for removal (rom the a9eded area at the time, and only part of that area <br />Previously ~t was proROSed to release the entire 4 acres of Sub-area 10A, which is the <br />route of a bused wnstrucfon water p~pellne that is currently Inactive out not abandoned <br />That area s revegetated and fusty r¢clauned, out pursuant to DRMS advice dunng tneu <br />June 5. 2607 sits inspecGOn, removal of this plpellne route 'rom the a!`ected area would <br />make repairs or ma~nlenance prohtamabc ~f the one is put back into service. It has <br />therefore been dedided to keep ins Sub-area 10A m tho affected acreage The 10 acres <br />of the Davis Dam construction matana~s stockpile iSub•area 108) are also not being <br />requested for releas¢ at this time In adddion, several small topsoil piles make up the 8 <br />acres of Subarea t OD, wnich s also not bung requested ror release at this Ume <br />Sixteen it6) o` the t7 acres of Sub-area tOC are bung raauestea for release <br />These are the roadway surface and the side slops cuts and felts. The roadway surface is <br />7 acres, and 5 acres o' side slopes have been reclaimed while 4 acres of rock cuts were <br />essentiauy complete as of completion of a>nstruclion. The 1 acre m Subarea tOC Inat <br />iS being retained as actve affected area is the area noAh of Firebreak road that ~ndudes <br />a water weU, pump house, and surrounding graded dr paved areas. This well may be out <br />back into service if water r.e¢ds d~ctaie Pursuant to DRMS advice during their June 5. <br />20U? inspectwn, d is better to retain tins area as active affected area d there is eny <br />chance the well rs to be put back m servi.:e or the pumping plant taconstrucled. <br />