Laserfiche WebLink
lbny Shale Od Proiact. Oolomda MLRa Pen`~n IV-Fl~7-i~~? R.-: A.,r, :ra ?CMG` <br />~8 ANactai Araa Status Summary and Ra~juest is Rcn~wnr r, A"o;-tad Acreage <br />Intensively cultivated to overcome those invading speaes based on recommandalions provided <br />by Colony's revegetation consultant, Accordingly, this 1 acre is not being requested for release at <br />this lime. <br />In their June 5 sde visit, the DBMS staff also advised that any areas sou regwred for <br />roubne site maintenance work should not be requested for release. even it the area is currently in <br />its permanent pest mining land use condition, In particular rn tSP Area 7 the approx~matety 2 <br />acres through "Tne Narrows" below the dam are currently occupied by a steel water supply <br />pipeline tnat delivers water hom the dam to a water-truck filling site at Ine tnp o` the Mlne Bench. <br />Since there may be a need from I~me to time to work in the pipeline. Lhat 2 acres of Area 7 is also <br />not Deng requested for rolease at th+s Ume. <br />Therefore, of the [oral 77 acres of aN.ected acreage in Area 7 70 acres of reclaimed <br />slopes and;or cliffs are being requested fnr release by virtue of Having been reclaimed. 4 acres o1 <br />dam and reservoir are bung clarified as to post-mining land use as a permanent water supply <br />system ,and 3 acres are Deing retained as affected acreage Tha three acres for which release <br />!s not requested are the 2 acres m "The Narrevrs" and 1 acre is the area on the rock quarry site <br />that Heads addn;dnal cultivation work 10 eradicate the irnading weed speaes. <br />4.2.3 Construction Water Pipeline to LaSal Laydown Area (ISP Area 168) <br />This area consists of 8 acres of the route of a burled construction water pipellr.e The <br />area designated as Area 16B ~s the pipeline route's climb up the ridge from the wens and Booster <br />pumps in Dav~s Valley, thence along the ridge to the LaSal area, and the extension down ~nlo <br />Coarse Ore Valley The imai :eg o' this construction. water pipeline. wn~ch climbs from the floor of <br />Coarse Ore Vatley up to a storage tank site on the plant site s also reclaimed. Dut that segment is <br />discussed later under Area 17 <br />The approximate limds of Area 16B are presented on Exnibii ^~3 Because of the limited <br />nature o1 this disturoance, as Discussed below, the post-mire~ng topography is essentia;ly the <br />same as pre•mining topography, and is depicted on Exhibit F-4. Limits of the areas that will <br />remain active affected acreage after approval of this plan are depiged on Exhibit F•11 'he <br />current condition of this area ~s presented in Figures 10. 11 and t2 <br />?his area involved only minor disturbance, essentially enough to cu4and-cover a i2" <br />steel pipe Topsoil was replaced immediately upon comptetron of the consirucbon, and the area <br />was seeded with the permanent seed mix <br /> <br />Figure 10 <br />Area ilia. Construction tNater P,~aiine to i.aSal area view looking SW Irom Davis Road a!!na ease of Soutn Spero Sw!a <br />VaUay Ra~ameo area s the hdamiy grossed smp ci~mbmy iFR ntlge m tna background. nn! Ina Arainape swaia m the <br />'oregre~nc <br />