Laserfiche WebLink
<br />sheet 1 of 2 <br />CIRCES Cost Estimatins~ Software <br />Task # <br />Date <br />User: <br />Agency or organization name :DMG <br />002 State :Colorado <br />11/10/2005 <br />ESC <br />County :Weld <br />Site :Riverbend <br />Permit or other job action :Am-01 <br />- _ Task descripticn :Replace Topsoil at Plant Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />ra~~y <br />Scraper work team -Scraper :Cat 627G <br />-Push dozer :Caf D6R Sedes II - 8SU <br />Support equipment -Load area ;NA <br />-Dump area : A <br />Road maintenance -Motor grader :NA <br />-Water truck ;NA <br />Cost Breakdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Impo data $fename : screpe2 dozer NA NA NA NA <br />Utilization-machine : 94 100 NA NA NA NA <br />-Ripper attachment: NA 0 NA NA NA NA <br />Ownerhip cesUhour : $46.97 $53.92 NA NA NA NA <br />Operating cesNhour : $124.32 $75.75 NA NA NA NA <br />Ripper ap. cesUhour : NA $0.00 NA NA NA NA <br />Operatorcostlhour: $32.72 $32.53 NA NA NA NA <br />Unit subtotals : $204.01 $162.21 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $570.23 Support : $0.00 Maintenance : $0.00 <br />Total work team cesUhour : x570.23 <br />factor : NA volume : 64,500 LCY <br />Source of quantity take-off :Based on 6"-12"on 53 acres <br />Source of estimated swell factor : NA <br />,. ; <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 64,500 LCY <br />PermiUjob # :M-2000-01 B <br />Abbreviation :none <br />Filename :MOf6-002 <br />