My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-10-02_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
1985-10-02_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 4:51:56 PM
Creation date
11/21/2007 5:35:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
10/2/1985
Doc Name
MINOR REVISION 7 LEACH FIELD CONSTRUCTION NEW ELK MINE FN C-012-81
From
MLRD
To
WYOMING FUEL CO
Type & Sequence
MR7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />Richartl D. Lamm <br />Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getches, Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Dlroetor <br />October 2, 1985 <br />Mr. David Stout <br />Environmental Coordinator <br />Wyoming Fuel Company <br />12055 West Second Place <br />P.O. Box 15596 <br />Lakewood, Colorado 80215 <br />RE: Minor Revision No. 7 - Leach Field Construction <br />New Elk Mine - File No. C-012-81 <br />Dear Mr. Stout: <br />• Enclosed is the approval for the above-referenced minor revision. The <br />Division has found that although the leach field will extend to within <br />100 feet of the Purgatoire River, that: 1) the area has been previously <br />disturbed by mining activity; 2) the stream channel will not be affected by <br />the revision; 3) if approved by the Colorado Department of Health, water <br />quality and quantity will not be adversly affected; and, 4) the reclamation <br />plan calls for the establishment of appropriate vegetation. <br />As you will note, a stipulation has been included for the final reclamation of <br />the septic system. No bond increase is required as a result of this <br />stipulation. Construction of the leach field may not begin until all <br />applicable permits are obtained by Wyoming Fuel Company. A copy of these <br />permits should be forwarded to the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />'~ Q~ <br />Jeffrey Deckler <br />Reclamation Specialist <br />JD/mis <br />• 3840E <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.