Laserfiche WebLink
ES Cost Estimati <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICA710N <br />Task x : 02a State r,craanc Perm~Vjob t< : M•2000.072 <br />Date : 0 ~~ 12/'1005 County :4M+nlrosci Abbreviation :none <br />User: SSS Site C:~a.-SW+IF. Filename:h4072-!22:r <br />Agency or organization name :C1A~ _ <br />Permit or other job action :SC'-u+ _ <br />-ask duscnphon :Rip and Grade pit Boor and area around pit perimeter <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat 07R Sarres f1 - 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 : RODS Cab _ Shifl basis : i per day <br />Attachment no. 2 3-shank upper <br /> Data source : (CRG/ <br /> UUlizatidn °~ <br />Cost Breakdown Ownership cosUhour : 540. ti4 NA <br /> Dozer operating cosVhour : 548 09 f 00 <br /> Rrpper operating costmour : SS.94 200 <br /> Operator cosL'hour : 531 78 NA <br /> Total unit cosUhour : St26.45 Total fleet cosUhour 5126.15 <br /> <br />MATERIAL QUANTITIES <br /> <br />Al; <br />h <br />t <br />ds - Selected estimating method : Area <br />ema <br />e met <br />o <br />Selamie : NA NA Load factor : NA Bank volume : NA BCY <br />Ards : 7.00 acres Rip depth (ri} ; t.00 Volume : 11,293 BCY or CCY <br />Source of estimated Guanury TR-0 f Maps <br />Source of eshmaled IOatl factor : NA <br />HOURLY PRODUCTION <br />Atlornate mvlhcds - Job Condilion Cortecbon Factors - <br />Seiamic : Seismic velocity . NA toeVsewnd UnadJusted production <br />Unadjusted production : NA cu. yds,lhour per selecletl method 2.217.54 cu. yds./hour <br />Aroa : Avg. tipping depth : 2.00 feeUpass Site attitutle : 5,000 feet <br />Average upping width 6.50 feeUpass Altitude adjustment : 1.00_ (Car HQi <br />Average ripping length : 500.00 feaVpass Job efficiency lector : 0.83 /2 shifVday) <br />Average dozer speed : 88.00 feeUminute Net)ob correction : 0.83 mulUphar <br />Average maneuver time : 0.25 minutoslpass <br />Production per urot area 0.755 acresrhour Adjusletl and production r, O ti; r; cu. yds./hour <br />Unae;ustetl protluct,on : 2,227.54 cu. yds.lhour I Adjusted fleet production 1,010.56 cu. yds.lhour <br /> <br /> <br />JOB TIME AND COST <br />fret size : 1 dazer(s) Total job Ume : 11.18 hours <br />Una cost : 50 125 per cu. yd. Tdtal lob cost : Si,413 <br /> <br />