Laserfiche WebLink
Agency or organization name :DRMS <br />Permit or other job action :Final Reclamation Costs Update <br />Task description :Distribute topsoil over 13.4 acres at 8"depth <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series II - 8SU (200: <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 per day <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $57.13 NA <br />Operating cosUhour : $77.13 100 <br />Ripper op. cosUhour : $3.35 50 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $170.39 Total fleet cosUhour : $170.39 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 14,420 LCY factor : NA volume : 14,420 LCY <br />Source of estimated volume :Mine /Reclamation Plan & Maps <br />Source of estimated swell factor:NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted howdy production : 1,400.0 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 0.00 % (/ <br />Average site altitude : 4,865 feet <br />Material weight <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.155 /LCY <br />1,600 Ibs/LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.10 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshifUday <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 1.44 (Cat HB) <br />Blade type : 1.00 (S/SU/U; <br />Net correction : 0.79 <br /> <br />Adjusted unit production : 1102.05 LCY/hr <br />Adjusted fleet production : 1,102.05 LCY/hr <br /> <br />Total job time : 13.08 Hours <br />Total job cost: $2,229 <br />