Laserfiche WebLink
CIRCES Cost Estimating Software <br />Date <br />User <br />17-Oct-2007 <br />THM <br />Permit or job no. <br />Abbreviation <br />Filename <br />M1981-058 <br />none <br />M058-000 <br />Agency or organization name :DRMS <br />Permit or job action :Final Reclamation Costs Update <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION <br /> <br />FORM <br />USED <br /> <br />FLEET <br />SIZE <br /> <br />TASK <br />HOURS _ <br /> <br />DIRECT <br />COST <br />01a -Rip and Rough Grade Phase 1 and Processing Area, 13.4 acres dozer 1 31.2 $5,327 <br />02a -Distribute Topsoil Over 13.4 acres at 8"depth dozer 1 13.0 $2, 229 <br />03a -Revegetation of 13.4 acres revege 1 16.0 $12,392 <br />04a -Mobilization and Demobilization mobilize 1 3.8 $1,026 <br />04b -Secondary Seeding Mobilization and Demobilization mobilize 1 3.8 $400 <br />' includes inflation /actor atljustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- <br />NA <br />Site :Debeque Gravel Pit <br />State :Colorado <br />County :Mesa <br />SUBTOTALS : 67. <br />T07AL DIRECT COST <br />Liability insurance : 2.02 % of direct total = <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA` NA NA total = <br />Profit : 10.00 % of direct total = <br />$21, 374 <br />$21,374 <br />$432 <br />$224 <br />NA <br />$2,137 <br />'not required (or eqp. operator serves as super.) <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - <br />Financialwarranty processing (legal/related costs) <br />Engineering work and(or contracUbid preparation <br />Reclamation management and/or administration <br />CONTINGENCY - <br />'contingencies accounted /or at task level <br /> TOTAL O & P = $Z, 794 <br /> CONTRACT AMOUNT (direct i O 8 P) _ $24,166 <br />500.00 total $ NA total = _ $500 <br />NA NA NA total = NA <br />5.00 % of cntr. NA total = $1,208 <br />NA' NA total = NA <br /> TOTAL INDIRECT COST= $4,502 <br />TOTAL BOND AMOUNT (direct + indirect) _ $25,876 <br />