Laserfiche WebLink
_ _ _ _ <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description CosUhour/unit (No. units) CosUhr/fleet CosUhr/fleet <br />-Light Duty Pickup, 4x2, 1/2 T $35.70 1 $35.70 $35.70 <br />... .. <br />EQUIPMENT HAUL DISTANCE and TIME <br />Subtotals : $35.70 <br />$35.70 <br /> Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time {hours) = 0.45 0.45 Total non-roadable mob/demob cost' <br />Return time (hours)= 0.45 0.45 'tworounatrlpswithhauirig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " <br />Unloading time (hours) = 0.50 NA "one roonq tap, no haur rig <br />Subtotals = 1.91 0.91 <br />Grand Junction <br />25.0 miles <br />55.0 mph <br />$367.65 <br />$32.45 <br />JOB TIME AND COST Total job lime : 3.82 hours <br />Total job cost : $400 <br />