My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-01-09_REVISION - M1988112 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1990-01-09_REVISION - M1988112 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 9:53:59 AM
Creation date
11/21/2007 5:31:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/9/1990
Doc Name
FAX COVER
From
STEFFEN ROBERTSON & KIRSTEN
To
MLRD
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'90 P1~09 18:[l~ $ ~PJ 985 9947 Sks DEt~P <br />BATTLE MOUN?AIN RESOURCES, SAN LUIS PROJECT <br />CMLRD ADEQUACY LETTER RESPONSES <br />Page 11 of 28 <br />16. Section D.6.1 states that, during Phase 1, 33Y. of the ~ailings will <br />be placed in the upper disposal area. Section D.6.5.3 states that, <br />during Phase 1, the upper area will generate drainage at about 310 <br />gpm, white the lower area will generate about 230 gpm. Please explain <br />why the )esser volume of tailings generates 120 gpm more water. If <br />these figures were used to evaluate the sizing and spat+al placement <br />of the aD5 collector pipes, the design should be re-evaluated. It <br />is essential that the drainage system be complete )y adeG~ate to <br />transmit flows from the tolls to the Catchment basin white minimizing <br />the hydraulic head within the facility. <br />tiS?Dt!SE: Tiie quantity difference of 80 gpm is a result of the l~crger surface <br />area of the upper area and thereby the drainage network under the <br />upper area and is not related to the amount of tailings deposited. <br />(he quantities were conservatively calculated assuming ghat the <br />entire surface area for drainage network for both the upper and lower <br />areas was covered with tailings which exhibited permeabilities <br />similar to permeabilitiey expected after one year of deposition. <br />First year tailings parmeabilities will decrease through <br />consolidation over time. By assuming these high permeal,illties over <br />the entire drainage network area and not ,lust the area of first year <br />deposition, the ma~ci~.um flows were conservatively est•mated at 310 <br />gpm for the upper area and 230 gp~a for the lower area <br />1~~ audition, the main collector pipes from the upper impoundment have <br />Sea+~ designed to collect almost four times the conservatively <br />calculated 310 gprr~ flow or 1200 gm. the main collector pipes from <br />the lower Impoundment have been deigned to collect over three times <br />the 540 gpm total flow or 1800 gpm. Additional capa=ity is also <br />available in the drainage blanket surrounding the pipe network. <br />The figures presented represent a conservative design for the pipe <br />network utilizing non-pressurized flaw (zero head) and minimum <br />graces. <br />the elevations cuntairied on Figures D.6-3 through D.6-5 should be <br />corrected, and the figures resubmitted. <br />L'Sv~i~VS_~ The ela_vatiens an Figures D.6-3 through D.6-5 have been corrected <br />and the corrected figures are included with this submittal. <br />'. '. The pond cross-section shown on Figure C•8 indicates a six-inch PVC <br />pipe will be used for the leak detactfon sump. The construction <br />details provided in Appendix J state that an eight-fnch pipe will <br />be used. Please c)arify. <br />PCS~UNSE: The correct PVC pipe diameter shown on Figure C•8 should be 8" as <br />stated in the construction details. The figure has been corrected. <br />94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.