Laserfiche WebLink
-3- <br /> 10. Primary future _ Cropland(CR) _ Pastureland (PL) General Agricultural (GA) <br /> (Post-mining) X Rangeland (RL) Forestry (FR) Wildlife Habitat (WL) <br /> land use Residential (RS) Recreation (RC) Industrial/Commercial (IC) <br /> (check one): Developed Water Resources (WR) Solid Waste Disposal (WD) <br /> 11. Primary present _ Cropland(CR) Pastureland (PL) General Agricultural (GA) <br /> land use X Rangeland (RL) Forestry (FR) Wildlife Habitat (WL) <br /> (check one): Residential (IRS) Recreation (RC) Industrial/Commercial (IC) <br /> Developed Water Resources (WR) <br /> 12. Method of Mining X Quarry (QR) Solution (SO) <br /> 12a. Other: Briefly explain mining method (e.g. Placer, truck/shovel). <br /> 13. On Site Processing Solution (SO) _ Chemical (CH) _ Thermal (TH) <br /> _ Heap Leach (HL) _ Vat Leach (VL) X Other <br /> Crushing and screening of gypsum <br /> 14. Application Fee: <br /> The application fee for Quarry mining is $2,325. <br /> The application fee for Solution mining or any Chemical or Thermal Processing <br /> is $3,100. <br /> If non of these methods or processes are to be included in the operation then <br /> the application fee is $1,875. <br /> The application fee for conversion to a 112 permit is $1,500. <br /> 112 Amendment application fee is $1,550. <br /> An applicant will not be issued a reclamation permit until notified by the Division that this application <br /> and the required performance and financial warranties have been approved. Alternatively, an <br /> automatic approval will occur where the Division fails to notify the applicantloperator that the <br /> application has been denied. The final agency action must be made within 120 calendar days from <br /> the date the application was submitted. However the performance and financial warranties must be <br /> approved by the Division or Board before a permit will be issued even if you receive an automatic <br /> approval. NO MINING OPERATIONS SHALL BEGIN (outside the existing 110 permit area) UNTIL A <br /> PERMIT IS ISSUED (Rule 7.2(2)), <br /> It shall be a provision of this permit that the operations will be conducted in accordance with the <br /> terms and conditions listed in your application, as well as with the provisions of the Act and the <br /> Mineral Rules and Regulations in effect at the time the permit was issued. <br />