My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-27_REVISION - M1981112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981112
>
2007-09-27_REVISION - M1981112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:08:55 PM
Creation date
11/21/2007 5:29:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981112
IBM Index Class Name
Revision
Doc Date
9/27/2007
Doc Name
Adequacy review #3
From
DRMS
To
Builders Aggregate Company, Inc.
Type & Sequence
CN2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resou¢es <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX: (303)832A106 <br />~' September 27, 2007 <br />r. Jim Miner <br />Builders Aggregate Company, Inc. <br />915 W. Beaver Ave. <br />Fort Morgan, CO 80701 <br />STATE OF COLORADO <br />esc c,6m L~~ <br />V <br />RE: Builders Aggregate Company, Inc.; File No. M-1981-112 / <br />Builders Aggregate; Conversion Application (CN-02) Adequacy Review #3 <br />Dear Mr. Miner, <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Bill Ritter, lr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Diredw <br />Natural Resource Trustee <br />The Division received your adequacy responses for the Builders Aggregate Pit Conversion Application 02 <br />(CN-02) on September 24, 2007. The Division of Reclamation, Mining and Safety (Division) has a few <br />remaining questions that need to be addressed prior to approval of the application. The Division is <br />required to make an approval or denial decision no later than September 3Q 2007, therefore, your <br />response to the following adequacy review concerns should be submitted to the Division as soon as <br />possible. <br />The operator notes Builders Aggregate Co. Inc. as the operator of the site, and our file also notes <br />Builders Aggregate Company Inc. Builders Aggre¢ate Co. Inc. is not listed with the Colorado <br />Secretary of States Office (SOS) and therefore not an entity registered to do business in the State of <br />Colorado. However, Builder's Aggregate. Inc, is listed with the SOS (see attached Articles of <br />Incorporation and ID summary). The operator will need to either register Builders Aggregate Co. Inc. <br />with the SOS, or transfer the existing permit to Builder's Aggregate, Inc. A copy of a Transfer of <br />Permit and Succession of Operators form can be obtained from the Division's web page at <br />httD://mining.state.co.us and is also attached for your use. Any changes to the applicant name will <br />need to appear correctly throughout the application form. <br />2. The reclamation plan notes a mining buffer zone of 30 feet from the South Platte River. In the event <br />of a significant flood event (10-year flood or greater) it is possible that the pit will be captured by the <br />South Platte River. Accordingly, the Division requests that the applicant provide specific mitigation <br />measures that will be implemented to minimize the potential for any offsite impacts. Mitigation <br />measures might include maintaining a larger buffer zone between the pit and the South Platte River, <br />installation of flood control spillways within the pit, and/or armoring riverside and/or pit slopes in <br />close proximityto the South Platte River with erosion controlriprap. <br />The operator states that the area will be reclaimed to industrial sites when mining is completed. The <br />operator will need to assure the Division that the end land use of industria- can be achieved. In <br />addition, in order to leave any structures on site, consent must be obtained; any buildings to remain <br />must meet current building codes and be consistent with the end land use. If the post-mining end land <br />use cannot be assured, a plan for revegetation must be submitted. The alternate plan will need to <br />include grading, topsoil replacement and reseeding of the area and well as posting of additional <br />reclamation bond. <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.