Laserfiche WebLink
05/25/2006 15:02 9708723792 <br />rr>7W ~ ~ <br />TRICOUNTYGRAUEL <br />GRAND GRAVEL ~ <br />P O BOX 566 <br />PAGE 08 <br />~~~D~~ s~ <br />HOTCHKISS, COLORADO 81419 <br />JULY 25, 2005 <br />DIVISION OF MINERALS AND GEOLOGY / RECEIVED <br />1313 SHERMAN ST. ROOM 215 V~jAY 2 5 2006 <br />DENVER, COLORADO 80203 <br />Division of Minerals & GeoloAY <br />ATTENTION: KATHLEEN SULLIVAN <br />ERENCE: GRAND GRAVEL PIT CONVERSION TO 112 OPERATION PERMIT <br />-98 019 REVISION NO CN-Ol <br />LAFARGE-111 PERMIT NO. M-2005-024~l/_ <br />DEAR KATHLEEN, <br />THIS LETTER IS TO CONFIRM THE AGREED UPON RELATIONSHIP BETWEEN <br />GRAND GRAVEL 112 CONVERSION AND LAFARGE 111 PERMITS UPON <br />APPROVAL OF THE 112 PERMIT. GRAND GRAVEL WISHES THE DMSION OF <br />MIN~tALS AND GEOLOGY TO RELEASE LAFARGE FROM THE <br />RECLAMATION RESPONSIBILITY AT THE END OF THE CDOT PRO.fECT <br />IlNH0402066. LAFARGE 13AS STOCK PILED TOP SOIL TO RECLAIM AREA <br />DISTURBED, AND GRADED THE FLOOR OF TILE PIT WHERE DISTURBED. <br />REASON FOR THIS DECISION IS TO UTILIZE ANOTHER 15 FEET OF GRAVEL <br />AROUND EAST AND SOUTH SIDES BEFORE THE BANK IS SLOPED AND TOP <br />SOILED. OVERBURDEN ON THIS AREA WILL BE USED TO TOP SOIL 3:1 <br />SLOPES AFTER 15 FEET OF GRAVEL IS REMOVED. FLOOR OF PIT CANNOT <br />BE TOP SOILED AT THIS TAKE BECAUSE THERE WILL BE MORE CRUSHED <br />GRAVEL STOCK PILED IN AREA. <br />SINCEREI.X, <br />MNRII.YN 1.. Y <br />