Laserfiche WebLink
ROADABLE EQUIPMENT <br />Machine <br />Description Total Fleet Size Haul Trip i Return Trip <br />iCosVhour/unit (No. units) J CosUhr/fleet Cost/hr/fieet <br />-Flatbed Truck, 4x2, 30K GVW ~l $53.85 I 7 $53.85 $53.85 <br /> <br /> i <br /> I <br />i +I ~ <br />--... -~ ~ I ~I <br />I <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $53.85 $53.85 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transoortation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />0.88 0.88 Total non-roadable mob/demob cost' <br />0.88 0.88 'two round trips with haul rig <br />0.50 NA Total roadable mob/demob cost" <br />0.50 NA "one round trip, no haul rig <br />2.75 I 1.75 <br />Grand Junction <br />sheet 2 of 2 <br />35.0 miles <br />40.0 mph <br />$562.68 <br />594.24 <br />Total job time : 5.50 hours <br />Total job cost : $657 <br />