Laserfiche WebLink
ROADABLE EQUIPMENT <br />sheet 2 of 2 <br />~ -- - - ~ <br />ma~~m.c I i~w~ <br />Description iCosUhour/unit iicci .ncc <br />(No. units) haul inN ~ rtcwin inN <br />~ CosUhr/fleet CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW ~ $53.85 1 ~ $53.85 i $53.85 <br />--- ~ ~I <br /> <br /> <br />--- - I <br />F <br /> <br />i <br />- ~ ~ I <br />_ <br />j I <br />~ I ~ <br />_ i <br /> <br /> <br /> <br /> I <br /> I <br /> <br />Subtotals : $53.85 $53.85 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cvcle Time : Non- Total one-way travel tlistance : 35.0 miles <br /> Roadable Roadable Average travel speed : 30.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.17 1.17 Total non-roadable mob/demob cost' : $5.962.82 <br />Return time (hours) = 1.17 1.17 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : $125.65 <br />Unloading time (hours) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 3.33 233 <br />JOB TIME AND COST Total job time : 6.67 hours <br />Totaljobcost: $6,OSB <br />