Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 14a <br />Date : 11/21/2006 <br />User : GRM <br />State :Colorado Permit/job# :M-1978-323 <br />County :Mesa Abbreviation :none <br />Site :Woodring Pit Filename :M323-14a <br />Agency or organization name : DRMS <br />Permit or other job action :Final Reclamation Liability Update - 2006 <br />Task description :spread overburden on N slope <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9U (2005) Horsepower : 405 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : 573.28 NA <br />Operating cosUhour : 599.23 100 <br />Ripper op. cosUhour : 50.00 0 <br />Operator cosUhour : 532.78 NA <br />Total unit cosUhour : 5205.30 Total fleet cost/hour : $205.30 <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume: 3,993 LCY factor <br />Source of estimated volume :accept <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 80 feet <br />Unadjusted hourly production : 1,547.6 LCY/hr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 30.00 % (neg) <br />Average site altitude : 5,400 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />Loose <br />NA volume : 3,993 LCY <br />volume from 2000 <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job eff ciency <br />Spoil pile <br />Push gratlient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />:ors Source <br />0.75 (avg.) <br />1.20 (Cat HB) <br />7.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshifVday) <br />0.80 (fnd-rf) <br />7.60 (Cat NB) <br />1.00 (Cat HB) <br />0.90 (Cat HB) <br />1.00 (S/SU/U) <br />0.86 <br />7330.10 LCY/hr <br />1,330.10 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 3.00 Hours <br />Unit cost : 50.154 /LCY Total job cost : $616 <br />