My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-23_REVISION - M1988112 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-23_REVISION - M1988112 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 4:30:56 PM
Creation date
11/21/2007 5:25:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/23/1992
Doc Name
MONITORING REQUIRMENTS SUMMARY SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Pit inflows will be monitored and evaluated also as a part of the <br />annual report. In addition, as discussed in the approved permit, these <br />inflow results will be submitted to the Division on a quarterly basis. <br />In the event of a spill, the Emergency Response Plan requires that <br />BMR notify the MLRD as soon as possible. Details for spill monitoring and <br />reporting will be determined with the MLRD on a case by case basis. <br />Results of the soils testing and the EP toxicity testing will be <br />submitted to the Division as soon as the results are available. <br />Table 1 presents a summary of all monitoring required for the San <br />Luis Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.