My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-04-23_REVISION - M1988112 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1992-04-23_REVISION - M1988112 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 4:30:56 PM
Creation date
11/21/2007 5:25:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
4/23/1992
Doc Name
MONITORING REQUIRMENTS SUMMARY SAN LUIS PROJECT
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2.2 Disoosal Area and Embankment Svstem <br />During operations, the settlement sensors will be checked on <br />a monthly basis and adjustments, if required, in subsequent lifts <br />will be made on the basis of the on-going monitoring program. <br />Monitoring will include quarterly sampling of tailings to <br />determine gradations, in-place densities, and deposition angles. <br />Density control tests will be performed on the tailings sand <br />deposited in the disposal area to verify that deposition obtains the <br />required density. After a trend has been established in i;he tailings <br />deposition testing, BMR will submit a technical revision to the <br />Division showing the trends and requesting a reduction in the <br />required monitoring. <br />Following establishment of a beach of tailings upstream of the <br />embankment and prior to construction of subsequent embankment raises <br />a specific study of tailings affected by the raises will be <br />performed. This study will include a determination of inplace <br />density, degree of saturation and material gradation for evaluation <br />of the structural integrity of the tailings under static and seismic <br />induced loading. <br />Monitoring of the flow site and quarterly sampliing of the <br />seepage from the drain system at the base of the tailings will be <br />performed. A plot of the rate of seepage over time will be <br />maintained and compared to the predicted rate. Chemical an alvsis <br />of the collection oond seeoage on a quarterly basis for the <br />parameters identified in Table G.1-2 of the aoproved aer~mit will be <br />performed. In addition, the leak detection system of the collection <br />pond will be monitored for any water weekly during initial six month <br />start-up and monthly thereafter. <br />2.3 Mass and Water Balance Monitoring <br />Each of the elements used in the evaluation of the mass and <br />
The URL can be used to link to this page
Your browser does not support the video tag.