My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-10-13_REVISION - M1999002
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999002
>
1999-10-13_REVISION - M1999002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:56 PM
Creation date
11/21/2007 5:23:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Revision
Doc Date
10/13/1999
Doc Name
MEMO TO FILE DIVERSION DITCHES AT PROCESS PLANT TR01
From
DMG
To
FILE
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />999 <br /> <br />STATE OF COLORADO <br />/, ~J%Ir't DIVISION OF MINERALS AND GEOLOGY <br />Department o atura esources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FAX: 13031 832-8106 <br />MEMO TO FILE <br />C p; File No: M-99-002 <br />Operator: American Soda / <br />Date: October 13, 1999 V <br />Specialist: Allen Sorenson ~~ <br />Subject: ~ o e- ~lAmzDiversion Ditches at Process Plant, Technical Revision TR-O1 <br />Person(s) Contacted and Affiliation: Paul McGuire, Steigers Corporation <br />SUMMARY AND RESOLUTION OF INTERACTION: <br />DIVISION OF <br />M[NERALS <br />GEOLOGY <br />RECLAMATION <br />MI NING•SAFETY <br />Bil I Owens <br />Governor <br />Greg E Watcher <br />Executive Director <br />Michael B. Long <br />Division DveUOr <br />Several of the process plant diversion ditches proposed in TR-O1 are larger than would be necessary to <br />carry the design flow plus 03 feet freeboard. However, the Operator will be required to build the <br />ditches to these sizes unless a design revision is submitted to and approved by the Division. <br />Ditch D-6 will carry the design flow, but does not provide adequate (03 feet) freeboard. The Operator <br />will resize the ditch to provide the required freeboard and will submit a revised page 8 to the <br />Attachment 2 diversion ditch calculations in TR-O1. The revised design will be provided by the <br />October 18, 1999 decision date for the technical revision. With the provision of an appropriately sized <br />ditch D-6 design, the Division will approve the technical revision. <br />cc: Paul McGuire, Steigers Corp. (vin frecsimile) <br />c:lwindows\personahamedcan soda twenlylhn:e.doc <br />~Uo ~ ~ ~~ u~ ~ /~ <br />r <br />~~- 6 C~ ~ v ~~ i cry '_ <br />{is ~ <br />A~~~ 1° -~5 ~~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.