My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-10-21_REVISION - M1988112 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1993-10-21_REVISION - M1988112 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2021 10:15:46 AM
Creation date
11/21/2007 5:23:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
10/21/1993
Doc Name
BATTLE MOUNTAIN RESOURCES INC BMRI SAN LUIS PN M-88-112 TR8 APPROVAL OF WELL LOCATIONS
From
BATTLE MOUNTAIN RESOURCES INC
To
DMG
Type & Sequence
TR8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ iii iiiiiiiiiiiii iii <br />BATTLE MOUNTAIN RESOURCES, INC. <br /> <br />October 21, 1993 <br />Mr. Jim Stevens <br />Division of Minerals and Geology To c~'OUNrAPA~'rliv <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luis <br />DMG Permit No. M-88-112, TR-08 <br />Approval of Well Locations <br />Dear Mr. Stevens: <br />This letter serves as a confirmation of the Division's <br />verbal approval (telephone conversation between <br />Alana Scott and Larry Oehler on October 20, 1993) of the <br />proposed locations (BMRI letter dated October 18, 1993) <br />for the additional monitoring wells as outlined in <br />conditions 2 and 4 of TR-O8. <br />Also, during an October 20, 1993 telephone conversation, <br />BMRI received a clarification on the required logging and <br />pump testing of the two new wells. Geological logging will <br />be conducted for both M-13R and M-14. Geophysical logging <br />will be performed only at M-14. No pump testing of the <br />wells is required. <br />A rig is scheduled to be on-site October 22 to drill And <br />complete the two additional wells. An immediate response is <br />requested if the Division is not in agreement with the <br />information provided in this letter. <br />If you have any questions, please call. <br />Sincerely, <br />~~o~ ~~ <br />Alana L. Scott <br />Environmental Engineer <br />cc: Larry Oehler <br />Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />A SUBSIDIARY OF BA 77 LC h1RUATAIX' G(11D COMpAhY <br />P.O. 60X J10 SAN LUIS.COLORADO XIIS'_~OJIO (719167?-336'_ FAX(719)67?-3363 <br />
The URL can be used to link to this page
Your browser does not support the video tag.