Laserfiche WebLink
Reclamation Table Continued <br /> Unit Cost Cost <br />As ect Reclamation O eration Quantit Units ($ $ <br />E. Access Road <br /> 1. To remain followin reclamation <br />F. Topsoil and Overburden Stockpiles <br /> 1. Material removed for other <br /> Aspects <br /> 2. Seed and mulch 2.0 Ac 800 1,600 <br /> 3. Reseed 20% 0.4 Ac 800 160 <br />G. Employee Facilities, Process Area, <br /> and Maintenance Facilities <br /> 1. Scarify compacted ground 28 Ac 50 1,400 <br /> 2. Replace topsoil, 6" x 28 acres 22,600 CY 1.25 28,250 <br /> 3. Seed and mulch 28 Ac 800 22,400 <br /> 4. Reseed 20% 5.6 Ac 800 4,480 <br />Total Disturbance Costs 208,935 <br />Contractor Mobilization/Demobilization (8%) 0.08 16,715 <br />Overhead (18.5%) 0.185 38,650 <br />Administration (5% 0.05 10,450 <br />Total Pro osed Financial Warran 274,750 <br />Remaining Disturbed Acreage 47 <br />Financial Warranty er Acre 5,846 <br />